Well, I have spent 3 weeks in circles with the town on the septic plan, something required for me to get a development permit. The document I was initially sent was incomplete and as a result, the requirements made no sense.
In the meantime, cleanup has paused in part due to needing to to get some planting in and in part due wanting to bundle smaller projects together. Once I get a backhoe in, it may as well do a number of things
Last week, I eventually received the full requirements for the septic permit (additional pages to the initially sent document), after paying for it in in advance in person at the city offices. This finally kicked of the design and I am hoping to get this back from the designer his week.
The house plan is still with the house drawing person and I am also hoping for a "final" this week as well. This should allow me to apply for the development permit and start working towards the build.
Driving there and back every day is 2 hours wasted and costly and having local facilities would make my life much easier.